My Blog Name https://www.wekivaparkway.com/wpcms/includes/blog.php My blog description en-us Section 8: Nighttime S.R. 429 Ramp Detour https://www.wekivaparkway.com/wpcms/includes/blog.php?d=805 The northbound Wekiva Parkway (S.R. 429) on ramp to Interstate 4 (I-4) at Exit 55 will close at 8 p.m. on Tuesday, February 11. The ramp will reopen by 6 a.m. on Wednesday, February 12. During this time, motorists will be directed to use Exit 54 at Rinehart Road as a detour route to eastbound and westbound I-4. This temporary closure will allow crews to paint a high-mast light.

 

Motorists are encouraged to plan for additional travel time, follow the posted detour signs, and drive with caution in the area.

 

Please note construction schedules may change due to weather or other circumstances. To learn more about the Wekiva Parkway project, please visit www.wekivaparkway.com or contact the project's community outreach team at 407-710-5610 or info@wekivaparkway.com.

 

]]>
February 7, 2025 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=805
Nighttime ramp closure on S.R. 429 off ramp at Exit 44 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=804 The northbound Wekiva Parkway (State Road (S.R.) 429) off ramp at Exit 44 will be closed from 10 p.m. on Wednesday, January 29 to 5 a.m. on Thursday January 30. During this time, detour signs will guide motorists from S.R. 429 Exit 39 onto northbound S.R. 453, leading to eastbound S.R. 46 (Sorrento Avenue). This temporary closure is necessary for crews to install pavement markings on the exit ramp as part of ongoing efforts to enhance road safety for drivers.

 

Motorists are encouraged to plan for additional travel time, follow the posted detour signs, and drive with caution in the area. Remember, to “move over” for vehicles on the shoulder. Safety is everyone’s responsibility. 

 

Please note construction schedules may change due to weather or other circumstances. To learn more about the Wekiva Parkway project, please visit www.wekivaparkway.com or contact the project's community outreach team at 407-710-5610 or info@wekivaparkway.com.

 

]]>
January 24, 2025 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=804
Section 7A: Nightly S.R. 429 Lane Closures https://www.wekivaparkway.com/wpcms/includes/blog.php?d=803 Expect nighttime single-lane closures on EB and WB State Road (S.R.) 429 between Longwood-Markham Road and Orange Boulevard beginning Wednesday, Oct. 23 for bridge maintenance. The work will take place from 8 p.m.-6 a.m. Sunday through Thursday nights over the next four weeks. Remember, slow down near construction activities.

]]>
October 22, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=803
Section 8: Ramp closures planned at: I-4/S.R. 429/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=802 Expect nighttime ramp closures from 9 p.m. to 5 a.m. on Monday, September 16, at State Road (S.R.) 417/S.R. 429 and Interstate 4 (I-4). The closures are necessary for overhead sign work.
 
Please see the following closures and detours:

  • EB/WB I-4 and International Parkway ramps to southbound S.R. 429: Use S.R. 46 to S.R. 429
  • EB I-4 ramp to southbound S.R. 417: Use 46A to Rinehart Road to S.R. 417
  • NB S.R. 417 to southbound S.R. 429: Use International Parkway to S.R. 46 to S.R. 429
  • WB S.R. 46 to southbound S.R. 429 past Orange Blvd.: Use the southbound S.R. 429 un-tolled on ramp near Longwood Markham Road Circle
     

Access to nearby residences and businesses will be maintained.
 
Electronic message boards will be posted.

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

]]>
September 14, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=802
Section 8: Ramp closures planned at: I-4/S.R. 429/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=801 Nightly ramp closures are scheduled from Sunday, August 11, to Thursday, August 15, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Nightly ramp closures are also expected from Sunday, August 11, to Tuesday, August 13, at S.R. 429 and I-4. The closures are necessary for roadway striping. Please see the following closure and detour:

 

  • Westbound I-4 to southbound S.R. 429 (8:30 p.m. – 6 a.m.): Use S.R. 46

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
August 9, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=801
Section 8: Ramp closures planned at: I-4/S.R. 429/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=800 Nightly ramp closures are scheduled from Sunday, August 4, to Thursday, August 8, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.
 
Please see the following closures and detours:

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A
  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road
     

Nightly ramp closures are also expected from Sunday, August 4, to Tuesday, August 6, at S.R. 429 and I-4. The closures are necessary for roadway striping. Please see the following closure and detour:

  • Westbound I-4 to southbound S.R. 429 (8:30 p.m. – 6 a.m.): Use S.R. 46

Access to nearby residences and businesses will be maintained.
 
Electronic message boards will be posted.
 
For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.
 
To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
August 2, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=800
Section 8: Nightly Ramp Closures at S.R. 429 and I-4 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=799 Nightly ramp closures are scheduled from Sunday, July 21, to Thursday, July 25, at State Road (S.R.) 429 and Interstate 4 (I-4). The closures are necessary for roadway striping and contingent upon weather conditions.

 

Please see the following closure and detour:

 

  • Westbound I-4 to southbound S.R 429 (8:30 p.m. – 6 a.m.): Use S.R. 46

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
July 19, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=799
Section 8: Nighttime Ramp Closures Planned at I-4 & S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=798 Nightly ramp closures are scheduled from Sunday, July 14, to Thursday, July 18, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
July 12, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=798
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=797 Nightly ramp closures are scheduled from Sunday, July 7, to Thursday, July 11, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.
 
Please see the following closures and detours:
 
Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A
 
International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road
 
Access to nearby residences and businesses will be maintained. 
 
Electronic message boards will be posted. 
 
For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.
 
To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.
 
 
 
]]>
July 5, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=797
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=796 Nightly ramp closures are scheduled from Sinday, June 30, to Wednesday, July 3, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.
 
Please see the following closures and detours:
 
Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A
 
International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road
 
Access to nearby residences and businesses will be maintained. 
 
Electronic message boards will be posted. 
 
For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.
 
To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.
]]>
June 28, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=796
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=795 A nighttime ramp closure is scheduled on Thursday, June 27, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.
 
Please see the following closures and detours:
 
Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A
 
International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road
 
Access to nearby residences and businesses will be maintained. 
 
Electronic message boards will be posted. 
 
For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.
 
To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.
 
]]>
June 21, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=795
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=794 Nightly ramp closures are scheduled from Sunday, June 16, to Thursday, June 20, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
June 14, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=794
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=793 Nightly ramp closures are scheduled from Sunday, June 9, to Thursday, June 13, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.
 
Please see the following closures and detours:
 
Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A
 
International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road
 
Access to nearby residences and businesses will be maintained. 
 
Electronic message boards will be posted. 
 
For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.
 
To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.
 
 
 
]]>
June 7, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=793
Nighttime I-4 Lane Closures Planned https://www.wekivaparkway.com/wpcms/includes/blog.php?d=792 Nighttime lane closures are scheduled on Interstate 4 (I-4) for Sunday, June 2 through Thursday, June 6. Please see the following lane closures:

 

  • Expect nightly lane closures on I-4 from State Road 46 to County Road 46A: Eastbound single lanes 8:30 p.m. – 6 a.m., double lanes 10:30 p.m. – 6 a.m.; westbound single lanes 7:30 p.m. – 6 a.m., double lanes 9:30 p.m. – 5:30 a.m. 

 

  • Lane closures will occur on the westbound I-4 C-D road 7:30 p.m. – 6 a.m.; Rinehart Road 9 a.m. – 4 p.m. and 7:30 p.m. – 6 a.m.; and, International Parkway 9 a.m. – 4 p.m. and 7 p.m. – 6 a.m. Remember to slow down near construction zones.

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

]]>
May 31, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=792
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=791 Nightly ramp closures are scheduled from Tuesday, May 28, to Friday, May 31, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

]]>
May 24, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=791
Nighttime I-4 Closure Planned https://www.wekivaparkway.com/wpcms/includes/blog.php?d=790 A nighttime road closure is scheduled for Monday, May 20. Eastbound and westbound Interstate 4 (I-4) will be closed between State Road (S.R.) 46 and Lake Mary Boulevard The closure is necessary to allow crews to dismantle and remove overhead sign structures.

 

Please see the following closures and detours:

 

  • Eastbound I-4 (10 p.m. – 4 a.m.): Use the Lake Mary Boulevard exit, then east to Rinehart Road, north to County Road (C.R.) 46A, and west to S.R. 417 to access eastbound I-4.

 

  • Westbound I-4 (10 p.m. – 4 a.m.): Use the westbound C-D road at S.R. 46 to access C.R. 46A. Take C.R. 46A east, then south to Rinehart Road, and west on Lake Mary Boulevard to access westbound I-4.

 

  • Northbound S.R. 429 to westbound I-4 (10 p.m. – 4 a.m.): Use southbound International Parkway to C.R. 46A east, then south to Rinehart Road, and west on Lake Mary Boulevard to access westbound I-4.

 

  • Northbound S.R. 417 to westbound I-4 (10 p.m. – 4 a.m.): Use southbound Rinehart Road, then west on Lake Mary Boulevard to access westbound I-4.

 

  • C.R. 46A to WB I-4: Use eastbound C.R. 46A, then south to Rinehart Road, and west on Lake Mary Boulevard to access westbound I-4.

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
May 17, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=790
Section 8: Ramp Closures Planned at S.R. 417/I-4 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=789 Nightly ramp closures are scheduled from Sunday, May 19, to Thursday, May 23, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

]]>
May 17, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=789
Section 8: Ramp Closures Planned at S.R. 46/I-4 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=788 A nighttime ramp closure is scheduled for Thursday, May 16, at State Road (S.R.) 46 and Interstate 4 (I-4). The closure is necessary for bridge work.

 

Please see the following closures and detours:

 

  • Eastbound S.R. 46 to westbound I-4 (8:30 p.m. – 6 a.m.): Use International Parkway to eastbound County Road (C.R.) 46A, then to the westbound I-4 ramp.

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

]]>
May 15, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=788
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=787 Nightly ramp closures are scheduled from Sunday, May 12, to Thursday, May 16, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

]]>
May 10, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=787
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=786 Nightly ramp closures are scheduled from Sunday, May 5, to Thursday, May 9, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
May 3, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=786
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=785 Nightly ramp closures are scheduled from Sunday, April 28, to Thursday, May 2, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
April 26, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=785
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=784 Nightly ramp closures are scheduled on Saturday, April 27, and Sunday, April 28, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

]]>
April 24, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=784
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=783 Nightly ramp closures are scheduled from Sunday, April 21, to Thursday, April 25, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:3

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
April 19, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=783
Section 8: Ramp closures planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=782 Nightly ramp closures are scheduled from Sunday, April 14, to Thursday, April 18, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
April 13, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=782
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=781 Nightly ramp closures are scheduled from Sunday, April 7, to Thursday, April 11, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

]]>
April 5, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=781
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=780 Nightly ramp closures are scheduled from Sunday, March 31, to Thursday, April 4, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

]]>
March 29, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=780
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=779 Nightly ramp closures are scheduled from Sunday, March 24, to Thursday, March 28, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

 

 

]]>
March 22, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=779
Section 8: Ramp Closures Planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=778 Nightly ramp closures are scheduled from Sunday, March 17, to Thursday, March 21, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway and westbound/eastbound I-4 to southbound S.R. 417 (8 p.m. – 6 a.m.): Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

 

]]>
March 15, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=778
Ramp closures planned at I-4/S.R. 417 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=777 Nightly road and ramp closures are scheduled from Tuesday, March 12, to Friday, March 15, at State Road (S.R.) 417 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway to southbound S.R. 417/ I-4 (8 p.m. – 6 a.m.) Use C.R. 46A or S.R. 46, then to Rinehart Road

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
March 8, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=777
Section 8: Ramp Closures Planned at I-4/S.R. 417/S.R. 429/C.R. 46A https://www.wekivaparkway.com/wpcms/includes/blog.php?d=776 Nightly ramp closures are scheduled from Sunday, February 25, to Thursday, February 29, at State Road (S.R.) 417, S.R. 429 and Interstate 4 (I-4). The closures are necessary for bridge work.

 

Please see the following closures and detours:

 

  • Northbound S.R. 417 to International Parkway and westbound/eastbound I-4 (8:30 p.m. – 6 a.m.): Use Rinehart Road to S.R. 46 or C.R. 46A

 

  • International Parkway to southbound S.R. 417/ I-4 (8 p.m. – 6 a.m.) Use C.R. 46A or S.R. 46, then to Rinehart Road

 

  • Westbound I-4 to southbound S.R 429 (7:30 p.m. – 6 a.m.): Use S.R. 46

 

  • Westbound I-4 to southbound S.R 417 and C.R. 46A (7:30 p.m. – 6 a.m.): Use S.R. 46 then to International Parkway

 

Access to nearby residences and businesses will be maintained.

 

Electronic message boards will be posted.

 

For additional information, please contact the project’s community outreach team at 407-710-5610. You may also email the team at info@wekivaparkway.com.

 

To learn more about the Wekiva Parkway project, please visit wekivaparkway.com.

 

 

 

]]>
February 23, 2024 https://www.wekivaparkway.com/wpcms/includes/blog.php?d=776